Second suites · Basement apartments · Barrie

Second suite & basement apartment design in Barrie.

Plan a second suite for family, a basement apartment for rental use, or permit drawings for an existing unit. Start with your property, then shape a practical layout and BCIN-qualified drawing package around your spring 2027 project goals.

Start with your name and email. Share plans, photos and property details during follow-up.

  • BCIN-Qualified Drawings
  • Permit Review Support
  • New and Existing Suites
Second dwelling unit exterior design for a Barrie property

Free consultation request

Plan your second suite with a clear next step.

Leave your name and email to request a conversation about a new basement apartment, an existing suite or an additional residential unit in Barrie.

What happens next

  1. Send your contact details. Phone is optional.
  2. Discuss the existing space and proposed use. We follow up about the property and project goals.
  3. Identify the drawing scope. We explain useful records, measurements and coordination for the next stage.

Second suite design · Barrie

Request your free consultation.

Tell us how to reach you. We’ll follow up to understand your suite project. Your inquiry and initial 30-minute consultation are free. How fees work.

Render processes this form for Conde Corp., operating as ESCL Design. Resend delivers your inquiry to ESCL. Google reCAPTCHA helps prevent spam. Google Ads and Meta may receive measurement data if you opt in to advertising.

Permit readiness uploads go to private Supabase Storage. ESCL’s inquiry team receives file references. Viewing the files requires an authorized account. We keep files as long as reasonably needed for follow-up, project work and recordkeeping. For access or deletion requests, email info@escldesign.ca. Read our Privacy Policy.

This choice is for project texts only. Promotional messages require a separate opt-in.

Add your name and email to get started.

Or email info@escldesign.ca.

Prefer to choose a time? Open the consultation calendar.

Spring 2027 second suite planning

Plan your second suite for spring 2027.

Use the winter planning period to review your property, develop the basement apartment layout and organize permit drawings. If spring 2027 construction is your goal, allow for design, consultant coordination, municipal review and contractor scheduling before setting a start date.

Page updated

  1. 01

    Gather the existing information

    Collect plans, basement photos, property records and any municipal notices. Note what you want the new unit to do.

  2. 02

    Resolve the layout questions

    Discuss the entrance, room arrangement, windows, stairs and service areas before committing to a finished design.

  3. 03

    Plan the next stage

    Confirm the drawing scope, consultant needs and project sequence. Design, municipal review and construction timing depend on your property.

One property. Different possibilities.

Which second dwelling are you planning?

Basement apartments, internal second suites and detached units have different design starting points. Tell us which one matches your project.

A new basement apartment

Turn an unfinished or finished basement into a separate living space. Start with the existing dimensions, entrance, windows and proposed rooms.

Discuss a basement conversion

An existing second suite

Understand the drawing work for a suite created without permits. Bring any permit records or municipal notices so the next steps reflect the existing work.

Explore existing-suite support

A detached additional unit

A garden suite or coach house sits outside the main home. Its design also needs to account for the lot, access, servicing and site conditions.

Discuss a detached unit

Barrie groups internal, attached and detached units under additional residential units (ARUs). Review the City's ARU planning and permit guidance for the checklist that fits your project.

Clear project guidance

A legal basement apartment starts with a property review.

Creating or legalizing a second suite can involve property zoning, existing-condition measurements, life-safety requirements, permit drawings, and municipal comments. These requirements vary with the home and proposed work. Early review can also reveal missing information that should be confirmed before the layout and construction scope are finalized.

ESCL Design organizes the drawing and permit process so homeowners understand what information may be required before construction begins. We document the existing space, develop the proposed basement apartment or second dwelling unit layout, prepare the applicable BCIN-ready drawing package, and provide drawing support during municipal review.

What the service includes

Second suite drawing and permit support

Existing-Condition Review

  • Site measurements for the suite area
  • Existing floor plans and basement layout review
  • Review of entrances, windows, stairs and likely egress issues

BCIN-Ready Permit Drawings

  • Proposed second suite or basement apartment layout
  • Floor plans, construction details and permit notes
  • Fire separation, alarm and egress information where applicable

Permit Submission Support

  • Application-ready drawing package for municipal review
  • Responses to municipal drawing comments
  • Coordination with consultants when required

Good-fit project types

We can help with:

Start with a property review so the proposed use and drawing scope can be considered before work begins.

  • A new basement apartment
  • An existing unpermitted suite
  • A legal second suite or second dwelling unit
  • A separate entrance or walkout
  • An additional residential unit
  • An Order to Comply related to a basement renovation

Property eligibility and consultant requirements vary. A project review does not guarantee that every property or proposed layout will qualify for approval.

A practical four-step process

From property review to permit support

  1. 01

    Property Review

    We review the address, project goals and available information.

  2. 02

    Measure and Plan

    Existing conditions are documented and the proposed layout is developed.

  3. 03

    Prepare Drawings

    We create the plans, details and permit information for municipal review.

  4. 04

    Permit Support

    We help address drawing-related comments during the review process.

Prepare for your consultation

Start with what you already have

You do not need a complete package before contacting us. Send the available information and we can identify useful next steps.

Send My Project Details
  • Property address
  • Photos of the basement
  • Existing drawings, if available
  • Approximate suite layout
  • Information about entrances and windows
  • Any municipal notice or Order to Comply

Local residential design

Second suite permit drawings across Barrie and Simcoe County

ESCL Design supports homeowners in Barrie, Alliston, Orillia, Innisfil, Bradford, Wasaga Beach, Collingwood, Midland and surrounding Simcoe County communities. The business office is in Alliston, and the drawing service supports nearby Ontario homeowners by project fit and availability. Municipal requirements vary, so each project begins with a review of the property, existing conditions and proposed work.

Permit drawings are one part of creating a legal unit. Barrie's ARU guidance explains zoning, permits, required inspections and registration. Check the City's current incentive information before building a rebate or grant into your budget.

Frequently asked questions

Second suite permit drawing questions

Requirements vary by municipality, property, existing conditions, and project scope.

Do I need a building permit for a basement apartment?

A building permit is generally required when creating or altering a basement apartment. The drawings and supporting information depend on the Barrie property, existing conditions, and construction scope. ESCL Design begins with a property review before confirming what the application may require.

Can you help legalize an existing basement suite?

Yes. We can document the existing conditions, identify drawing information that may be needed, and prepare a proposed permit package for municipal review. Construction upgrades, zoning confirmation, engineering, or other consultant input may also be required depending on the suite and property.

What second suite drawings are normally required?

A typical package may include existing and proposed floor plans, room dimensions, entrances, windows, stairs, construction details, and notes for fire separation, alarms, and egress. The final drawing list depends on the building, proposed work, and municipal review requirements.

Do you submit the second suite permit application?

Permit submission support can be included when it is part of the agreed project scope. Municipal fees, deposits, third-party reports, and consultant fees remain separate. We can also help respond to drawing-related comments issued during the municipal review.

How do I get started?

Send the property address, basement photos, any existing drawings, your preferred layout, and information about entrances or windows. If the suite already exists, include any municipal notice or Order to Comply so the project can be reviewed accurately.

How much do basement apartment drawings cost?

The design fee depends on the existing space, available records, proposed work and drawing scope. Start with a consultation so we can define the work before quoting. Municipal fees, construction and third-party consultant costs are separate.

When should I start planning a second suite for spring 2027?

Start with a property review and gather existing plans, basement photos and any municipal records. Use the winter to develop the layout and organize the drawing scope. A spring 2027 construction goal should allow for design, consultant coordination, municipal review and contractor availability; the schedule is specific to your project.

Start with a property review

Let's plan your basement apartment or second dwelling.

Tell us about your property and receive clear guidance on the drawings, documents, and permit support your project may require.